web stats | Rin Beach, Pha-Ngan Island :: Wastewater Treatment Project |

  Rin beach, Pha-Ngan Island has its reputation as the best place in the world to organize Full Moon Party Festival. It attracts over 10,000 visitors monthly. The numbers of visitor keeps rising annually, as well as the wastewater which diminishes the natural beauty. Accordingly, Tourism Authority of Thailand (TAT) decided to deploy centralized wastewater treatment system for multi-sources water purification from resorts, shops and houses along the beach before a disposal to the sea. BIOTECH RCX-Series is the only system qualified to provide recycle level of clean water.  The system incorporates an exclusive process that removes nitrogen and phosphorus constituents.
   The sewage pipeline was laid along the beach and cut through the shopping area to collect wastewater. The treatment site is located at Rin beach management office. In addition, the FRP sculpture, which represents Full Moon Party Festivals, is built by Fibertech and placed in front of the office.
   Another challenge for this project is the transportation. The tanks are ferried to the island and trucked through meandrous road. For the reason, the tank was bi-sectioned and rejoined on the installation site. The leakage tested was performed and none of the problem occurred.

Concrete pavement

Pipeline in shopping area

Landscape adjustment

Pipeline along the beach and resorts

Sewer pipeline laying

Adjusted landscape

Tank burial

Deployment

Trucking

Arrival at Phangan Island

Transported by ferry

Full Moon Party FRP sculpture

Clean water is returned to environment