web stats | TOT Corporation Head Office :: Wastewater Treatment Project |
   Wastewater treatment system for TOT Corporation head office (previously Thai Organization of Telephone) was installed simultaneously with the construction of main building. It was deployed in an U-shape alignment beneath the front and side road of the building.  The pillar was erected narrowly with the tank to support the weight of passing vehicles.
   Since the treatment system is installed in an crowded area. the oderless system was required and BIOTECH RCX-Series system was chosen to purify water before disposal to the drainpipe.

Installation beside the building

Installation in front of the building

Pillars erection